..
CO control
Activation
Operating status: Test: Delay time
Pre-alarm CO: High
Pre-alarm O2: MIN
Load controller Y to CO control
CO control Y and load controller
O2: Content
CO: Content
External correction signal 1
External release
Operating status
CO measuring system: Status
O2 measuring system: Status
CO control unit: Status
Start
Reset
Simulation: Purge
Simulation: Flame
Trouble
Digital channel
Description
Message signal from the CO/O2 measurement and control system to the HMI.
Input
163
Ready
Not ready
The CO measuring system is ready.
Reference
DOC-726587655