Valve test system
Type
F [1 - 3]: VPS: Load valve
F [1 - 3]: VPS: Load time
F [1 - 3]: VPS: Relief valve
F [1 - 3]: VPS: Relief time
VPS: Calculating the testing times
F [1 - 3]: VPS: Fuel valve 1: Proof time
F [1 - 3]: VPS: Fuel valve 2: Proof time
F [1 - 3]: VPS: Valid time
F [1 - 3]: VPS: Fuel valve 2: Delayed close
Parameter
Description
The valve test can only be performed for gaseous fuels:
If no valid valve test is available upon burner start, then the valve test is performed on burner start during the purge sequence.
If the pressure relief of the test segment of one fuel is to be performed via fuel valve 2, then the valve test after shut-down is permitted only together with post-purging.
For information on this topic, refer to DIN EN 676:2003 section "4.3.4.15 Valve monitoring system".
Properties
Selection parameter
The valve test is performed during the purge sequence before every burner start in gas firing operation mode.
A valve test is performed after every fuel cutoff in gas firing operation mode.
The valve test is performed before every burner start and after every fuel cutoff in gas firing operation mode.
See also
Fuel type
Post-purging
Reference
1072, 1073; 1021, 1022; 1352, 1353