Description
This parameter is dependent on Pump station [1 - 4]: Pumps: Change-over: Type
Function of this parameter depending on the pump switching:
- [0]
-
Delay time until pump B is started after pump A is no longer requested.
- [1]
-
Delay time until pump B is started after pump A is no longer requested.
- [2]
-
The duration of the operation overlap of both pumps until pump A is stopped (pump B is the primary pump).